An inspection result loses value if the team cannot tell which part it belongs to. Plan the loading and output flow with the same care as the inspection criteria, especially when several similar parts move through a station.
Define the physical unit of work
Decide whether the process tracks individual parts, tray positions or another agreed unit. Explain how that reference is assigned and maintained. Do not imply individual serial traceability when the proposed handling only identifies a batch or position.
Make result destinations clear
Identify the routes for accepted parts, rejected parts and items awaiting review. Ask how the process prevents an operator from unintentionally returning an unresolved item to normal flow. The quality team should approve the disposition rules.
Include interruptions
Discuss what happens when a tray is removed, a cycle stops or a part is reintroduced. The production and engineering teams need an agreed recovery method that preserves the link between the item and its outcome. Avoid inventing a restart procedure without knowing the equipment.
Check the handover in the trial
Observe where a result could become detached from its part and record the remedy needed. Our AOI production planning guide provides the broader evaluation steps.
Frequently asked questions
Is a tray-position record the same as a permanent part serial number?
No. Define exactly what the identifier represents and how the physical part remains associated with it.
Should an unresolved inspection result enter the accepted-parts flow?
Follow the quality team’s authorised disposition process; do not treat an unresolved result as an ordinary pass.
Why include interrupted cycles in the handling review?
Interruptions can expose uncertainty about which parts were inspected and where their results belong. Plan and assess recovery explicitly.