
An acceptance review should compare evidence with the requirements agreed before the trial. A polished demonstration is useful, but the decision needs a record of what was tested and what remains uncertain.
Identify the tested configuration
Record the part variants, inspection setup and relevant handling arrangement. Note changes made during testing. Results from one configuration should not be presented as though they were obtained with another.
Examine incorrect decisions
Compare machine outcomes with the approved reference judgements. Investigate both rejected acceptable samples and accepted unacceptable samples. Do not hide these cases inside an overall success percentage without explaining what was counted.
Check the untested conditions
List important production conditions that the session did not cover. Assign an owner to resolve each one and decide whether another evaluation is required. A demonstration can support the next step without being treated as final production release.
Write a bounded decision
State what is accepted, which conditions apply and what is still open. The automotive inspection evaluation guide helps establish the brief that this decision should answer.
Frequently asked questions
Should an AOI trial be judged only by its overall pass rate?
Review the reference outcomes, types of incorrect decisions and test conditions as well as any summary metric.
What if settings changed halfway through the evaluation?
Identify the revision and separate the results obtained under each configuration before drawing a conclusion.
Can a trial be useful without granting production approval?
Yes. It may establish feasibility or identify further work, provided the outcome and remaining conditions are stated clearly.